Ordinance No. 15,422ORDINANCE NO. 15,422 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 7 TO THE CITIZENS BANK RENOVATION PROJECT WITH CONSTRUCTION MASTERS OF HOUSTON, INC., IN AN AMOUNT NOT TO EXCEED TWO THOUSAND EIGHT HUNDRED NINETY-EIGHT AND 54/100 DOLLARS ($2,898.54); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 7 to the Citizens Bank Renovation Project with Construction Masters of Houston, Inc., in an amount not to exceed TWO THOUSAND EIGHT HUNDRED NINETY- EIGHT AND 54./100 DOLLARS ($2,898.54). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 13`h day of April, 2023. 'MMNDON CAP TILLO, Mayor R: Karen Anderson•ORDINANCES\2023\2023.04.13.ChangeOrderNo7-CitizensBankRenovationProject.docx I MT Date of Issuance: Contractor: Designer: EXHIBIT "All CHANGE ORDER Citizen's Bank Renovation 4:'131023 Construction Masters of Houston, Inc. Element Architects, LLC CITY OF BAYTOWN PUBLIC WORKS & ENGINEERING 2123 Market St. Baytown, Texas 77520 Change Order No.: 7 CoB Project No.: FAIS01 P.O. No.: 2203812 Explanation: This change order encompasses the following: 7.1) credit per two (2) cash depository drawers in reception area. Owner requested change from 7 deal drawers to 5. 7.2) credit per Nemo-Q kiosks to be coordinated by USB as owner furnished and installed items. 7.3) addition of millwork changes and blocking in meter tech room due to revised layout requested by USB. Owner request to include 7 meter tech stations. 7.4) addition of drywall wraps and tiling per conflict of steel columns in lobby area. 7.5) addition of spread footing detail at conflict lightpole base due to intereference with unforeseen underground conditions. 7.6) addition of electrical revisions including one (1) exit light per Fire Marshal requirements, circuit for irrigation system, and owner requested GFCI receptacle in USB office. 7.7) modifications to base cabinets in reception area per owner requested change to accommodate size of Xerox printers 7.8) addition of access doors in lobby area millwork to accommodate six (6) customer facing monitors Description of Work 7.00 Total change order 07 per the itemized description above Please attach back-up documentation: CPR-007 Cost & Time Change Summary Original Contract: Previous Change Order(s): Contract prior to this change order: Net increase (decrease) from this change order Revised Contract: Finance Approval: RECOMMENDED: By: Date: 3/30/23 Design Engineer Architect ACCEPTED*: By: Z?aA*t&�, gz4d� Date: 3/30/23 Contractor Cost Time $ 2,898.54 0 Days Cost Time $ 3,467,695.00 559 Days $ 167,526.06 35 Days $ 3,635,221.06 594 Days $ 2,898.54 0 Days $ 3,638,119.60 594 Days Date: RECOMMENDED: By:? 1A0G) - Date: 04/03/2023 Director of Public Works & Engineering APPROVED: By: Date: City Manager *Contractor agrees to perform change(s) included in this Change Order for the price and time indicated The prices for changes included all costs associated with this Change Order No work is to be done until this change order is executed No payment to the Contractor (or Consultant) shall be made for work included in the change order until the Contractor's pay estimate is updated Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent, this Change Order governs Upon execution by all parties, the following changes identified for the contract value and/or contract time shown, are made part of the contract Construction I of I D16 Revised 2021 ONSTRUCT[ON ASTERS OF HOUSTON, INC. P.O. Box 1587 - Pearland, Texas 77588 - 281/997-2640 - Fax: 281 1485-4702 Change Proposal Request Project: City of Baytown Utility Service Building Date:12/21/22 Revised 3/29/23 Change Proposal No: 7 To: Danielle Cain Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials, and supervision to provide changes. Meter Tech and Other Changes Meter Tech Millwork Changes $ 3,758.00 Blocking for Meter Tech Millwork and fur down @ pull down stairs. $ 1,560.00 Credit for deal drawers 204.00 x 2 $ (408.00) Credit for Nemo -Q $ (14,050.00) Steel Drywall Wraps $ 1,400.00 Lobby tile add $ 895.00 Light Pole Footer $ 2,674.72 Electrical: Add Exit Light, Add conduit and Irrigation circuit & GFCI, Receptacle for Marcus Office $ 3,790.00 Add Access Doors $ 1,750.00 Base Cabinet Modifications $ 1,350.00 Subtotal $ 2,719.72 OH&P $ 135.99 Additional Bond Premium (2.5% up to $100K; 1.5% up to $500K) $ 42.84 Total Change Proposal Request $ 2,898.54 l . Meter Tech Millwork Changes 2. Metal framing and drywall fur down around pull downstairs. 3. Credit to delete 2 deal drawers. 4. Credit to delete Nemo - Q Kiosks 5. Lobby Tile - Windowsills added. 6. Light Pole Footer - GTS Concrete 7. Exit light (requested per FM), Irrigation circuit and receptacle, Receptacle in Marcus' office. 8. 5 Access doors in teller line. 9. Modify 2 base cabinet elevations to allow for printers. Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com 42ww MILLWORK 11353 Dover St, Houston, TX 77031 Phone: 832-619-1068 Fax: 281-530-1943 PROJECT: City of Baytown Utility Services Building LOCATION: 315 W. Texas Ave, Baytown, TX 77520 CONTRACTOR: Construction Masters of Houston CONTACT: Dennis Busby SUBJECT: Change Order Proposal DATE: 12-13-2022 CWW CASEWORK: Agrees to fabricate and install the following per drawings and specs: 1. Meter Techs Room #A119 a. Delete & Credit Back Two PLAM Base Cabinets—___-$686.00 b. Fabricate and install additional 32'SgFt SS Countertop W/ powder coated steel brackets. $4,444.00 Total Change Order Package: (Fabrication and Installation) $3,758.00 Inclusions: Solid surface counter and any item listed above. Exclusions: Paint @ cabinets, Glass, Stainless steel, Electrical, plumbing, mechanical installations and any items not listed If any questions please feel free to contact us back at (832) 619-1068 or email at reception (a. c w wmill workllc. com Estimator: Obed Morales Phone: 281-802-3081 Obed. m(acwwmill workllc. com PROVIDE CONCEALED METAL BRACKET TO SUPPORT SS02 wl,FR TECH COUNTERS WITH NO STORAGE UNDER TM. A I FLOORPLAN - METER TECH UTILITY SERVICES BUILDING 315 W. TEXAS AVE. BAYTOWN, TX 77520 12/5/2022 sP�dbrace TECHNICAL SPECIFICATIONS The Speedbrace is a heavy duty countertop and shelf support brace without a kicker. They feature a 1.5" x 1,5" notch to enable fast alignment against a wall with a 2x2 cleat installed. Speedbraces also include pass-throughs for cords and chamfered screw holes. Speedbraces support up to 1,000 Ibs per pair when installed at 16" on center. Colors Shea • White powdercoat • 21" x 28" • Black powdercoat • 21" x 24" • Gray primer • 15" x 18" • Stainless Steel • 8" x 12" . 5" x 8" Mane" • A-36 Steel plate • 12 gauge (0.1046" thick) Load cape ft • 1,000 lbs. per pair (installed 16" on center) *round hole design only Fa>stereers • Designed for installation with conventional bugle -head or drywall screws • Screw holes chamfered for flush installation • Screws may be concealed with Fastcaps after installation • Provision for 3 screws on wall side • Offset screw holes on shelf side for flexibility Oter Features • 1.5" x 1.5" notch in corner for installation against 2x2 wall cleat • 5" x 8" Speedbrace has 1.5" x 0.5" notch for installation with 1x2 wall cleat • Pass -through holes for cables & cords Chamfered Screw Hole Capped with 9116" Fastcap Fort Bend Drywall, LLC 8907 Royal Crest Lane, Richmond, Texas 77469 Phone:713-702-7258 Fax:281-605-5869 Date: Tuesday, December 20, 2022 Proposal to: Construction Masters of Houston Dennis Busby 3908 3rd street Pearland, Texas 77581 Phone: 281-997-2640 Fax: 281-485-4702 Job No.: Project: Utility Services Building 315 W, Texas Ave. Baytown, Meter Test Blocking Plans Date Tuesday, December 20, 2022 We appreciate the opportunity to bid on this project. This proposal is based on normal working hours and uninterrupted conditions while working as close as possible with other trades. Price is valid for 30 (thirty) days. All bonding is excluded. General Contractor to furnish one set of construction drawings and documents. SCOPE OF WORK: 09250 Drywall: 1,560.00 Add 2' 3/4" noncombustible plywood on all walls in Room A117 Meter Test Added Fur down with drywall around pull downstairs Cleanup for above BASE BID AMOUNT 1,560.00 Thank You Mike Pant QUOTATION FROM NEMO-Q 11/29/21 Quote #: Baytown By: Michael Bruner Phone: 972-347-1766 Customer: Baytown Address: • • Phone: QTY. PART NO DESCRIPTION UNIT PRICE PRICE HARDWARE 1 11092 Wall Mount Print Station with Thermal Printer $2,200 $2,200 2 11041-NP Black Touchscreen Kiosk wl NP Printer $5,800 $11,600 EQUIPMENT TOTAL: $13,800 Shipping Charge $250 GRAND TOTAL $14,050 ANNUAL COSTS SMS Overage $.015 per SMS Annual maintenance agreement. After the 1-year Warranty $2,070 Annual SMS Package $0 Annual Appointment Software $0 Annual Server Hosting Fee $0 NQ Touchscreens limited to 30 screens NEMO-Q reserves the right to alter SMS package to a higher tier Customer is responsible for any taxes or local user fees Quote is valid for 90 days NEMO-Q, Inc. PO Box 6090 Fed ID: 14-1906060 McKinney, TX 75071 DUNS: 19-274-2901 Phone: 972-347-1766 Suggested action is to wrap columns with sheetrock Suggested action is to wrap column with sheetrock and build fur- down over beam Suggested action is to add % sheetrock over entire wall to hide bracing Fort Bend Drywall, LLC 8907 Royal Crest Lane, Richmond, Texas 77469 Phone:713-702-7258 Fax:281-605-5869 Date: Tuesday, January 17, 2023 Proposal to: Construction Masters of Houston Dennis Busby 3908 3rd street Pearland, Texas 77581 Phone: 281-997-2640 Fax: 2814854702 Job No.: Project: Utility Services Building 315 W, Texas Ave. Baytown, Texas Plans Date Tuesday, January 17, 2023 We appreciate the opportunity to bid on this project. This proposal is based on normal working hours and uninterrupted conditions while working as close as possible with other trades. Price is valid for 30 (thirty) days. All bonding is excluded. General Contractor to furnish one set of construction drawings and documents. SCOPE OF WORK: 09250 Drywall: furrout 4 columns on 3 sides as close as posible to column Sheetrock and level 4 finish Install furrdown on room 114 to cover Mezz. beam Metal framing, sheetrock and level 4 finish Add 1 layer sheetrock in rooms 158 and 158 A ti cover steel Level 4 finish Cleanup for above BASE BID AMOUNT Thank You Mike Pant 1,400 1,400 PROPOSAL January 23, 2023 RE: City of Baytown Utility Services Building 315 West Texas Avenue, Baytown, TX 77520 From: Impact Stone Design, Inc. Contact: Veronica Reyna 3118 Golfcrest Boulevard Phone: 713-731-7222 Houston, TX 77087 Pursuant to your request, the following is price for the above -mentioned project. Impact Stone Design, Inc. shall supply material for the areas discussed. ITEM DESCRIPTION 09 30 00 - Tiling 1. TL-02 Installation: 50 SF of TL-02, Crossville State Of Grace 12x24 Satin CROGRC011224SAT Locations: LOBBY A112, CIRC. A157 at Window Sills Materials: $529 Labor: $367 Cost $895 Excludes: SALES TAX Thank you for the opportunity to bid this project. Impact Stone Design, Inc. prices are firm for 30 days from date on Proposal Any changes will require a revised bid. Impact Stone Design, Inc. is HUB, SBE, & WBE Certified e Project: Baytown USB Change Order #: 8 Date: 2/27/2023 TO: Construction Masters Attention: Dennis Busby Phone: 281-780-3871 The work covered by this proposal shall be performed under the same terms and conditions of the original contract Reference: Description of Change: Canopy Footing Item Descrintion Quantity Unit Cnst Itam Tntal 1 Rebar $ 172.92 2 Labor $ 900.00 3 Equipment $ 752.92 4 Concrete w/ Min Load Charge <6c 2c -1.5c = .5c $ 500.00 5 15% Mark U $ 348.88 It 10111it I Kindly acknowledge receipt of this Change Order Proposal by signing and returning a copy to our office NOTE: The Change Order Proposal becomes part of and in conformance with the existing contract. Signature of the General Contractor indicates agreement herewith, including adjustment of contract sum Notes: GTS Concrete LLC Greg Schoener, Partner (Authorized GC Signature and Date) 2,67 .72 1183 Brittmoore, Suite 200 Houston, Texas, 77043 Tel: 281.974.4774 November 7, 2022 Baytown Utility Services Building 315 W. Texas Ave. Baytown, Tx 77520 Re: Exit Light/Irrigation Circuit & Empty Irrigation Conduit Per changes in the project scope of work requested, we are pleased to offer for your consideration the following change order for the electrical work at the above address per NEC and Local Electrical Code. We propose to provide all labor, material, and equipment needed to complete this work for the lump sum amount of $3,790.00 taxes excluded. Our scope includes the following: Add exit light (per specs/submittals), irrigation circuit & irrigation control wire conduit only. • Install new exit light • Install Irrigation circuit & GFCI • Install empty conduit for sprinkler system control wires • Breaker To avoid confusion, we offer the following clarifications & exclusions: 1. Bond is not included; our rate is 3%. 2. Underground dedicated 3" conduit shown on E1.1 & continuation on E3.1. 3. The current scope is limited to electrical work only, no structural modifications to building (i.e., ceiling, walls, furniture, millwork, or floors). 4. Painting or cutting/patching of existing finishes, except factory finishes are excluded. 5. Data, fire alarm, security, telecom & low voltage equipment or wiring. 6. Covid-19 Pandemic dictates shipping dates for commodity items. Leggio Electric will provide approximate lead times for specified items but will not be held liable for items that are backordered or delayed due to the pandemic. 7. All coordination with Utility Electrical Distributor (i.e., Center Point) and the Retail Electrical Provider (i.e., Reliant) is the customer's responsibility. All charges or fees (if any) are also excluded. We will attend any meetings and/or site visits that the customer schedules with the Electrical Utility Distributor. (713)644-2051 6329 Dixie Drive Houston, Tx 77087 Regulated by the Texas Department of Licensing and Regulation Contractor's License 4 34472 PO Box 12157 Austin, TX 78711-2157 (800) 803-9202 j (512) 463-6599 l www.tdh.texas. ov Adopted Administrative Rules: 73.51. (c) Electrical Contractors' Responsibilities Change Proposal • cost Detail Project BMown Utility Service Bldg. Contractor/SuOwntrada Construction Masters of Houston/leggio becirlc Material labor Burden 40ti E ul ant Subtoul Ma Total Description Unit qry Material Unit Total 9A�terlal Lest Noun Unburdened labor Ubor Burden Amoum Tobllabor Cost Unit tIRS Equipment Unit Cost Total Egdpnent Cost Cost M-W-1, labaor& Equipm C&P Cost Matedal, labor& ulent 9 prnmt E l-rnen Electrician $ 20 $ 42.00 $ 16.80 S 1,176.00 $1.176.00 $ 117.60 $ 1,293.60 4jinandveEled,ld- $ 20 $ 30.00 $ 12.00 $ moo $ 840.00 $ 84.00 $ 924.00 enrta Truck $ $ $ 1 20 12 $ 240.00 $ 240.00 $ 24.00 $ 264.00 1' RI ld Conduit PF 80 $ 7.00 $ 560.00 $ $ 560.00 $ 56.00 $ 616.00 3/4' EMT PF 1001$ 2.00 200.00 $ $ $ S 200.00 S 20.00 22MOO Wo-mUnt Hardware LS 1 $ 75.00 $ 75.00 1 J$ 75A0 $ 7.SO S 82SO 912 THHN wire PF 300 S 0.25 S 75.OD $ $ $ $ 7S.00 $ 7.S0 8250 Exit U ht r apprwedl submittal EA 1 $ 79AS S 79.45 $ $ 79.45 $ 7.95 $ 87.40 GFCI FA 1 30.00 30A0 S S $ $ 30A0 3.00 33A0 I-.- FA 1 202 20.. S S S 20.00 21 22A0 Bre.k.1pal,20-p EA 1 $ SO.00 S SO.00 $ $ 50.01) $ 5.00 $ SS.00 Bom,T-Eon&blank covers IS 1 $ 100.00 $ 100.00 $ $ $ $ ]OD.00 $ 10.00 $ 110.00 $ $ $ $ $ $ $ $ Mat Co. ar I 34ALS53, ewm MILLWORK 11353 Dover St, Houston, TX 77031 Phone: 832-619-1068 PROJECT: CITY OF BAYTOWN UTILITY SERVICES BUILDING LOCATION: 315 W. TEXAS AVE. BAYTOWN, TX 77520 CONTRACTOR: CONSTRUCTION MASTERS OF HOUSTON CONTACT: JUSTIN DAVIS E-MAIL: justin(7cmhou.com PHONE: 281 997 26 40 SUBJECT: CHANGE ORDER 3: 5 ACCESS PANELS IN LOBBY AREA REF DRAWINGS: DATE: 03/16/2023 CWW CASEWORK: agrees to the following: 1. Fabricate 5 access doors panels 1811x24" for power outlets in the lobby area, each door with have a lock. Totalamount....................................................................$1,750.00 If you have any questions please call to our office (832) 619-1068 or send an email to our Estimator: Jorge Buchely jorge.b@cwwmillworkllc.com MILLWORK 11353 Dover St, Houston, TX 77031 Phone: 832-619-1068 Fax: 281-530-1943 PROJECT: CITY OF BAYTOWN UTILITY SERVICES BUILDING LOCATION: 315 W. TEXAS AVE. BAYTOWN, TX 77520 CONTRACTOR: CONSTRUCTION MASTERS OF HOUSTON CONTACT: JUSTIN DAVIS E-MAIL: justin(*cmhou.com PHONE: 281 997 26 40 SUBJECT: CHANGE ORDER 4 REMOVE ONE BASE CABINET IN 2 ELEVATIONS REF DRAWINGS: Picture Attached DATE: 03/28/2023 CWW CASEWORK agrees to the following: 1. Remove one cabinet in 2 elevations Room # A156 Circulation Area Totalamount............................................................1,350.00 Inclusions: Remove 1 cabinet in 2 elevations, add finish end to base cabinets, polish the countertops edge. Exclusions: Any items not listed. If any questions please feel free to contact us back at (832) 619-1068 or email at receution(k�,cwwmillworkllc. com Estimator: Jorge Buchely iome.Wwwwmillworkllc. com