Ordinance No. 15,164 ORDINANCE NO. 15,164 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS,AUTHORIZING CHANGE ORDER NO.4 FOR THE CITIZENS BANK RENOVATION PROJECT WITH CONSTRUCTION MASTERS OF HOUSTON, INC., IN AN AMOUNT NOT TO EXCEED SEVENTEEN THOUSAND NINE HUNDRED SEVEN AND 53 100 DOLLARS ($17,907.53); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN,TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 4 for the Citizens Bank Renovation Project with Construction Masters of Houston,Inc.,in an amount not to exceed SEVENTEEN THOUSAND NINE HUNDRED SEVEN AND 531100 DOLLARS ($17,907.53). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 11 th day of August, 2022. B ON CAPETILLO, Mafor ATTEST: SNYTOK% cl"'O °° J O ANGELA SO i C+.Cler m a ° • , � y��cno alfc.i'Y .. APPROVED AS F RMi SCOTT LEMON , City Attorney R:Karen Anderson ORDINANCES\2022\2022.08.1 I.ChangeOrderNo.4-CitizensBankRenovationProject.docx EXHIBIT "A" CITY OF BAYTOWN P�e� PUBLIC WORKS&ENGINEERING 2123 Market St. Baytown,Texas 77520 r BAYTO E CHANGE ORDER Citizens Bank Renovation Date of Issuance: 8/11/2022 Change Order No. 4 Contractor: Construction Masters of Houston, Inc. CoB Project No.: FA1801 Designer: Element Architects, LLC P.O.No.: 2203812 Explanation: This change order encompasses the following: 4.1)Addition of an irrigation backflow preventer and accessories including concrete pad, and insulated cover with heated cable for weatherproofing against severe freezing temperatures. 4.2)Original plans called for tie in to storm system with one new manhole.The manhole was precast with incorrect elevations and returned for a credit.The work is for an additional 22LF of 18" storm sewer connecting to an existing adjacent 24" storm sewer, as well as the removal and replacement of disturbed sidewalk. 4.3)Hardware for nine(9)of thirty-six(36)doors,including changes to original door schedule for functional benefit. Three(3)door hardware sets revised to include card reader,aluminum door closers,floor stops,power transfer,and wire harnesses.The associated doors and frames could not be ordered until a decision was made on door access and lock standardization. This delay caused price escalation due to industry wide escalation. Description of Work Cost Time All labor, material and equipment to complete install of site irrigation I blackflow preventor with concrete pad and insulated inclosure with heating element on existing water meter. $ 6,925.46 0 Days All labor,material to complete demolition of sidewalk, installation of 18" 2 RCP,and placement of 4" thick replacement sidewalk. $ 1,418.03 3 All door hardware and assecories for nine(9)access doors. $ 9,564.04 Total $ 17,907.53 0 Days Please attach back-up documentation: Construction Masters Change Proposal Request No.4 dated 7 15,2022 Cost&Time Change Summary Cost Time Original Contract: $ 3,467,695.00 559 Days Previous Change Order(s): $ 58,189.08 35 Days Contract prior to this change order: $ 3,525,884.08 594 Days Net increase(decrease)from this change order $ 17,907.53 0 Days Revised Contract: $ 3,543,791.61 594 Days Construction 1 of 2 D16 Revised 2021 Finance Approval: Date: RECOMMENDED: RECOMMENDED: g (P.Helemann) Date: 08/02/2022 1% . - _ y � By: �Date:0$I4212022 Design Engineer/Architect Director of Public Works&Engineering ACCEPTED*: APPROVED: BYZ-;odtru..�- Date:8/1/2022 By: Date: Contractor City Manager 'Contractor agrees to perform change(s)included in this Change Order for the price and time indicated. The prices for changes included all costs associated with this Change Order. No work is to be done until this change order is executed.No payment to the Contractor(or Consultant)shall be made for work included in the change order until the Contractor's pay estimate is updated. Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent,this Change Order governs. Upon execution by all parties,the following changes identified for the contract value and/or contract time shown,are made part of the contract. Construction 2 of 2 D 16 Revised 2021 ONSTRUCTION ASTERS OF HOUSTON, INC. P.O. Box 1587 —Pearland,Texas 77588 —28 1/997-2640—Fax: 281 i 485-4702 Change Proposal Request Project: City of Baytown Utility Service Building Date:7115122 Change Proposal No: 4 To: Marvaughon Bolin Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials, and supervision to provide changes. Backflow Preventer Irrigation Meter Backflow Preventor(Spring Creek) $ 5,390.00 Irrigation BFP Concete (GTS) $ 300.00 BFP Cover(Eastgate) $ 808.20 Subtotal $ 6,498.20 OH&P $ 324.91 Additional Bond Premium (2.5%up to$100K; 1.5% up to$500K) $ 102.35 Total Change Proposal Request $ 6,925.46 Storm Line Ashton $ 1,185.00 Spring Creek $ (1,154.45) GTS-Pour Back $ 900.00 GTS-Red Dye Concrete $ 400.00 Subtotal $ 1,330.5S OH&P $ 66.53 Additional Bond Premium (2.5% up to$100K; 1.5%up to$500K) $ 20.96 Total Change Proposal Request $ 1,418.03 www.cmhou.com Houston Builders Hardware $ 8,974.00 Subtotal $ 8,974.00 OH&P $ 448.70 Additional Bond Premium(2.5%up to$100K; 1.5%up to$500K) $ 141.34 Total Change Proposal Request $ 9,564.04 Additional Time Requested: None Scope: 1. Install backflow preventor with pad and enclosure on existing water meter. 2. Storm Line changes per onsite meeting and RFI. 3. Door hardware Door hardware changes from submittals review. A 113, A 113A, A 117, A119, A127, A128, A152B, A156A, A159. 2 months of cost increases on hardware, P-lam doors, and aluminum. From date of submittal return on 4i 15 to order on hold pending RFI 6 response received on 6i 10. Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com Baytown Utility Services Building Date: July 26,2022 To: Construction Masters of Houston From: Adam Sydnor Spring Creek Contracting,LLC. PO Box 690029 Houston,TX 77269 asydnor@springcreeklic.com Re: Baytown Utility Services Building Change Order Request NoAR-Irrigation Backflow Preventer ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL 1 Irrigation Backflow Preventer EA 1.00 Labor&Equipment Day 1.00 $ 2,250.00 $ 2,250.00 Backflow Preventer EA 1.00 $ 2,500.00 $ 2,500.00 Miscellaneous Pipe&Fittings EA 1.00 $ 150.00 $ 150.00 Subtotal $ 4,900.00 Overhead&Profit(101 o) $ 490.00 Total $ 5,390.00 Accepted By: Company Signature Printed Name Date Spring Creek Contracting,LLC GTS Concrete Project: Baytown USB Change Order#: 4 Date: 7/26/2022 TO: Construction Masters Attention: Dennis Busby Phone: 281-780-3871 The work covered by this proposal shall be performed under the same terms and conditions of the original contract Reference: Description of Change: BFP Pad Item Description Quantity Unit Cost Item Total 1 10"x 36"pad w#4 bar for BFP $ 300.00 TOTAL 300.00 Kindly acknowledge receipt of this Change Order Proposal by signing and returning a copy to our office NOTE:The Change Order Proposal becomes part of and in conformance with the existing contract. Signature of the General Contractor indicates agreement herewith,including adjustment of contract sum Notes: GTS Concrete LLC 1 Greg Schoener, Partner (Authorized GC Signature and Date) 1183 Brittmoore, Suite 200 Houston, Texas, 77043 Tel: 281,974.4774 7/27/22, 10:22 AM Backflow Enclosure-100S-AL-Lift-Off-Safe-T-Cover—Eastgate Supply Free Shipping On All Orders FFEASTGATE JSUPPLY LAND5CA"-INDVSTNVIL C-ERCIA, What are you looking for? D 0 Questions? Call(800)583-4891 Flumf.- > Backflow Enclosure 100S AL Lift-Off Safe-T Cover Backflow Enclosure - 10OS-AL - +' Lift-Off - Safe-T-Cover $808.20 FREE SHIPPING SKU loos At This American made back flow enclosure features a lift off design for maximum accessibility,and comes with anASSE Standard 1060 compliant drain flap.It is recommended to add the Chromalox Heat :'x,• Cable 030 with 90W of heat to protect from freezing temperatures. This enclosure is made from marine grade aluminum.polyisocyanurate foam insulation board,and a glass fiber reinforced facer on each side. The 100S-AL enclosure is easy to set up,safe for testers.and helps offer protection from vandalism. Dimensions:7-W x 32-L x 22-H Pipe Size:V Backflow Enclosure - 100S-AL - Lift-Off - Safe-T-Cover $808.20 FREE SHIPPING SKU 10OS-AL This American made back flow enclosure features a lift-off design for maximum accessibility,and comes with an ASSE Standard 1060 compliant drain flap.It is recommended to add the Chromalox Heat Cable#30 with 90W of heat to protect from freezing temperatures.This enclosure is made from marine grade aluminum,polyisocyantirate foam insulation board,and a glass fiber reinforced facer on each side.The 10OS-AL enclosure is easy to set tip,safe for testers, and helps offer protection from vandalism. Dimensions:7"W x 32"L x 22"H Pipe Size:1" Heater/No Heater Without Heater V Quantity [_Add to cart 1 Share this: https://www.eastgatesupply.com/products/backflow-enclosure-100s-al-lift-off-safe-t-cover?variant=15683350364195 1/7 7/27/22, 10:22 AM Backflow Enclosure-100S-AL-Lift-Off-Safe-T-Cover—Eastgate Supply PRODUCT SPECS Model:100S-AL Weight:26 lbs Dimensions:7"W x 32"L x 22"H Options:With or without 90W Heat Cable ✓ Free Shipping ! Need a written quote? Rf��quest Online $Volume Pricing on Large Orders T Questions?Call(800)583-4891 PRODUCT HIGHLIGHTS ■ Marine-grade aluminum construction material ■ All models are lockable for vandal protection ■ Easy access for testing and repairs ■ ASSE Standard 1060 compliant drain flap ■ Easy installation ■ Offers freeze protection when used with the recommended heat ■ Made in the USA SHIPPING ✓ All items ship for free(standard ground,see map) Call:(800)583-4891 for pricing and shipping questions. Shipping estimates shown on the map pertain to this specific product only.Orders typically ship within 24 business hours.Transit times displayed in the map are listed in business days,and are approximate.The day that the order is shipped is not counted as a transit day. Ira \D {� ID so I \H ]II RI L{ PA \: \1 � OH LT II. N E co Ks ][O {r- K]' 1 ~ NC TN + \11 OK AR sc GA ](S AL Tx Transit Days L{ ❑ 1 Day FL El 2 Days 0 3 Days 4 Days El 5 Days i Q 6 Days https://www.eastgatesupply.com/products/backflow-enclosure-100s-al-lift-off-safe-t-cover?variant=15683350364195 217 Safe-T-CoverTM BACKFLOW PREVENTION ASSEMBLY ENCLOSURE SPECIFICATION PART 1 GENERAL 1.1 WORK INCLUDED A. Provide manufactured backflow prevention assembly enclosure. 1.2 QUALITY ASSURANCE A. Qualifications: The backflow prevention assembly enclosure manufacturer shall be a company specializing in the manufacture of backflow prevention assembly enclosures with at least 5 years of successful experience designing and selling enclosures to various customers in different climatic regions. 1.3 STORAGE AND HANDLING A. Store products in shipping containers and maintain in dry place until installation. 1.4 ACCEPTABLE MANUFACTURERS A. Safe-T-CoverTM or Engineer approved equal. 1.5 REFERENCES A. ASTM B209. B. ASSE 1060-Performance Requirements for Outdoor Enclosures for Backflow Prevention Assemblies. PART 2 PRODUCTS 2.1 MODEL NO. & SIZE A. Model No. shall be 100S-AL. B. Inside dimensions shall be 7"W x 32"L x 22"H. 2.2 MATERIALS OF FABRICATION A. Material of fabrication shall be 5052-H32 marine grade aluminum(.050:18 gauge), mill finish and shall meet ASTM B209. B. Insulation shall be 1.5" (9.0 "R" value)minimum thickness polyisocyanurate foam laminated to a glass fiber reinforced facer(each side). The insulation shall have the following properties: 1. Dimensional Stability-Less than 20/b linear change, ASTM D-2126; 2. Compressive Strength-20PSI, ASTM D-1621; 3. Water Absorption-Less than 1076 by volume, ASTM C-209; 4. Moisture Vapor Transmission-Less than one(1)perm, ASTM E-96; 5. Product Density-Nominal 2.0 lbs. per cubic foot, ASTM D-1622; 6. Flame Spread=25,ASTM E-84; 7. Service Temperature== -1001F to +2501F maximum. 8. The insulation shall be of uniform thickness. June 27,2019 2.3 ROOF &WALLS A. The roof and walls of the enclosure shall be constructed of 5052-1132 (.050.!18 gauge) marine grade aluminum, mill finish, ASTM B209 outside with insulation 1 1;2" (9.0 "R" value) thick in the walls and roof. B. The enclosure shall be completely removable for access for testing and maintenance. C. The complete assembly shall be protected by being inside the enclosure. D. Clear opening drain panel area shall be TV x 5 14"11. E. Drain flap shall have a stainless steel hinge and a stainless steel light strength spring as a positive means of closure so that it will not be activated by wind. F. The drain flap shall be constructed of the same materials that is used in the walls and roof of the enclosure. 2.4 Heating Equipment A. Heating equipment shall be furnished and designed by the manufacturer of the enclosure to maintain an interior temperature of +40OF with an outside temperature of -30"F. Install heating equipment as per manufacturer's instructions and governing local and national codes. 2.5 MOUNTING HARDWARE A. Mounting hardware shall be furnished and shall be constructed of 5052-H32 aluminum. B. All masonry fasteners shall be metal hit anchors. C. All necessary drill bits shall be furnished. D. All mounting brackets shall be on the inside of the enclosure. The enclosure shall be mounted in such a way that removal will be by removal of lockable stainless steel rod only. PART 3 INSTALLATION A. Enclosure shall be mounted on a concrete pad 11"W x 36"L x 4"- 6"Thick. B. Enclosure shall be assembled and mounted to concrete pad according to manufacturer's instructions. June 27,2019 Ashton Sav,,ing and Drilling ASI,PI.TDN Quote QUOTE NO.: 125156 Prepared for Construction Masters of Houston Prepared by Raymond Brown Contact rbrown@ashtonsawing.com o. +19364452461 m. +19365371900 315 W Texas Ave Paving Job Name Demo Contact Josh Moore Phone+17138902949 Address 315 W Texas Ave City Baytown,TX Fax 77520 Email josh@cmhou.com NAME PRICE SUBTOTAL Diesel Saw Diesel saw area for bobcat removal. Saw into 5'x5' blocks. Over cuts to be ok. 150sq'x4" Est sawing-90'x4" $375.00 $375 00 Slurry Containment Water/slurry control and containment. $250.00 $250.00 Break&Haul Use bobcat to remove paving,load and haul off. 150sq'x4"(2 cubic yds) $500.00 $500.00 Fuel Surcharge Saw crew: $30.00 L&H:$30.00 $60.00 $60.00 Total without tax $1,185.00 2022-07-05 Baytown Utility Services Building Date: July 5,2022 To: Construction Masters of Houston From: Adam Sydnor Spring Creek Contracting,LLC. PO Box 690029 Houston,TX 77269 asydnor@springcreekllc.com Re: Baytown Utility Services Building Change Order Request No.3-Storm Sewer Tie-In Revision ITEM DESCRIPTION UNIT QUANTITY UNIT COST TOTAL I ADD 18"RCP LF 22.00 Labor&Equipment Day 0.50 $ 2,750.00 $ 1,375.00 Cement Stabilized Sand Load 2.00 $ 400.00 $ 800.00 Pipe LF 22.00 $ 45.00 $ 990.00 2 DEDUCT Storm Manhole EA -1.00 Labor&Equipment Day -0.10 $ 2,750.00 $ (275.00) Cement Stabilized Sand Load -1.00 $ 400.00 $ (400.00) Manhole EA -1.00 $ 2,000.00 $ (2,000.00) 3 DEDUCT 18"HDPE LF -18.00 Labor&Equipment Day -0.25 $ 2,750.00 $ (687.50) Cement Stabilized Sand Load -1.50 $ 400.00 $ (600.00) 3 Pipe LF -18.00 $ 14.00 $ (252.00) Subtotal $ (1,049.50) Overhead&Profit(I V o) $ (104.95) Total $ (1,154.45) Accepted By: Company Signature Printed Name Date Spring Creek Contracting,LLC C te Project: Baytown USB Change Order#: 3 Date: 7112/2022 TO: Construction Masters Attention: Dennis Busby Phone: 281-780-3871 The work covered by this proposal shall be performed under the same terms and conditions of the original contract Reference: Description of Change: Add 150sf of 4"Sidewalk Item Description Quantity Unit Cost Item Total 1 JAddition of 150sf of 4"sidewalk $ 900.00 TOTAL $ 900.00 Kindly acknowledge receipt of this Change Order Proposal by signing and returning a copy to our office NOTE The Change Order Proposal becomes part of and in conformance with the existing contract. Signature of the General Contractor indicates agreement herewith,including adjustment of contract sum Notes: GTS Concrete LLC / Greg Schoener, Partner (Authorized GC Signature and Date) 1183 Brittmoore, Suite 200 Houston, Texas, 77043 Tel:281.974.4774 GT5 Concrete Project: Baytown USB Change Order#: 4 Date: 7/14/2022 TO: Construction Masters Attention: Dennis Busby Phone: 281-780-3871 The work covered by this proposal shall be performed under the same terms and conditions of the original contract Reference: Description of Change: 1 yard of red dye concrete Item Description Quantity Unit Cost Item Total 1 IRed dye concrete I I $ 400.00 TOTAL $ 400.00 Kindly acknowledge receipt of this Change Order Proposal by signing and returning a copy to our office NOTE:The Change Order Proposal becomes part of and in conformance with the existing contract. Signature of the General Contractor indicates agreement herewith,including adjustment of contract sum Notes: GTS Concrete LLC Greg Schoener, Partner (Authorized GC Signature and Date) 1183 Brittmoore, Suite 200 Houston, Texas, 77043 Tel:281.974.4774 HOUSTON BUILDERS HARDWARE, INC. Q a":a 10535 S. Wilcrest, Suite 170, Houston, Texas 77099-2888 Phone 281-495-0595 Fax 281-495-0428 July 1, 2022 Dennis Busby Construction Masters of Houston PO Box 1587 Pearland, TX 77588 Re: Baytown Utility Services Building Explanation of price increases & changes Dear Dennis, I am pleased to extend to you, the following explanation of the price increases incurred on this project: Add due to hardware changes ADD $3,968.00 Add for hardware due to loss of price concession ADD $2,021.00 Add for aluminum due to loss of price concession ADD $2,200.00 Add for p-lam doors due to loss of price concession ADD $785.00 TOTAL ADD $8,974.00 Should you have any questions, please do not hesitate to contact me. Sincerely, XeWv r. V aoq� Keith T. Barzilla KTB/Ibm ONSTRMION ASTERS OF HOUSTON, INC. 3908 Third St.,Pearland,TX 77581 P:(281)997-2640 F:(281)485-4702 SUBMITTAL COVER Project Name: Baytown Utility Services Building Date: 3/10/2022 Architect: Element Architects, LLC Architect Address: 1250 Wood Branch Park Drive,#480 Architect City,State,Zip Houston,TX 77079 General Contractor: Construction Masters of Houston, Inc. Submitted By: Justin Davis General Contractor Address: 3908 Third Street General Contractor City,State, Zip: Pearland,TX 77581 Subcontractor or Supplier: Houston Builders Hardware Address: City,State,Zip: Contact: Phone: Manufacturer: Submittal Number: 08 7100.02.A Submittal Item: Door Hardware-Schedule Specifications Sections: 087100 Drawing Numbers&Detail References: A603/Door Schedule/Hardware Set Location of Installation: General Contractor Approval A&E Approval ELEMENT ARCHITECTS EXCEPTIONS NOTED-Conect and Proceed Accepted X Accepted as Noted ❑ EXCEPTIONS NOTED-REVISE AND RESUBMIT Returned for Correction Rejected ❑ This review is only for general conformance with the design concept of the protect and Approved AS NOTED general compliance with the information given in the Contract Documents Corrections or comments made on the shop drawings during this review do not relieve contractor from compliance with the requirements of the plans and speafications Approval of a Construction Masters has reviewed this submittal prior to specific item shall not include approval of an assembly of which the item is a transmittal to the architect.Approval does not relieve the component Contractor is responsible for dimensions to be confirmed and correlated subcontractor or vendor of the responsibility for accuracy, at the jobsde information that pertains solely to the fabrication processes or to the completeness.quantities,dimensions and compliance with means methods techniques,sequences and procedures of construction coordination contract documents. of the work of all trades and for performing all work in a safe and satisfactory manner ONSTRUCTION Element Project No. 20024 Submittal No ASTERS S Dailey 1"Submittal 2ndSubmiftal a Reviewed by Dennis Busby NOF HOUSTON,INC. Reviewed by _ y Date: 4/13/2022 Additional Notes: For your approval JOB 9"TOWN UTILITY SERVICE ELM ITEM SUMMARY SHEET PAGE SWE-7 3151DAS ANE SAMWN IX- 3 1520 DATE: Z/75177 REV. REV. JOB Let REM TOTAL No. DESCRIPTION OF PRODUCT FINISH MANUFACTURER REFERENCE Ory UNIT EXTENSION s t HINCIM 5B81 n Sx 4.5 G5Z E_s B`Z HI 4 P _ 5E&1HW4-5X45. LI CORE _ _C_7 W/S MR61N All ocks i ccd to be ca mble of LZ CyLLLVVaW CL3351 C7 p2n 4 2C. CORal fAf rcc ivin 7 - in SF C co-es. L3 CA UXXISUd04 C 357 C7 PZ 1-26 COR&IN Pro ide ccnstI1ICtiCI1 C01 es. Owner CL3355 C7 PZD ra2G �RB1 N wi or er FI co es o their own lOZG. CDR ad N anc Iii-al-ICT finalc Ing. Lb 5 C7 DZD 12>26 MRSI N El [E'C EXIT QEVYee IytEC Z5S R1N CON 4 C/ ODR C/ PA C CLpSEg, '105p CUSH_ _ A L L C N /1 OVER HEA D STOP 4505 G 30 G.7 JOB ITEM SUMMARY SHEET PAGE SZLIFSZ DATE: REV. REV. JOB# ITEM TOTAL NO. DESCRIPTION OF PRODUCT FINISH MANUFACTURER REFERENCE OTY UNIT EXTENSION S 1 WALL STOP 43o !-S 93G G 53 SILENCER ER 64 2VES 84 &3O VET PI PUSH PLATE PZ NI I PDYYER 7RAN-VEW l=PT 10 CON VDNEYJPPJN Im 2 IN SL'NLAGE 1Y13 WIRE 14ARIVESS C40N GW SrCINLAG£ WI OQIPCAP 14 Z A Z 141 AL ZER4= /EO /3 .vd--tl SWEEP 8198 AA 360 AL on Wq 65A 36" AL Z•RU JOB DOORWARE SCHEDULE PAGE I QF 1 DATE: REV. REV. JOB# LOCATION S1ZE IMATERIAL t°P Kk TAG F 1� DOOq - — " LB HW IKEY Hingee Locks edn Hdder Clout Push Pull Armor Silence Mac MI= Miu NO O .nn NO W Hi iK DH FR iV HAND ST SET oy Item Oy Item py Item Gy Item Gy Item Gy JimOy Item OY Item Oy Item Qy It.. lum Oy lum N11.2 I P AI0-1 TERIOR FRY LDBBY _- 7030_ gam.[sly 4A L W ❑ R .- - - -- - r- N Z I AI_p_ !- FRM 1D88Y__ I 13A 7HA- -- --_-71" S I 66Y M- -CD13B.�_- _3 P 0 I 4 II LI Z I C I J -All'lL _-_ MM DEPOSIT _ f 4 6Z I I -NI ! 3 A113 MRR TO COMF IGAL RH - I L ! 1 Aiwa AK Tp - KX11 -- 4 I I S I C1 I KI - - - _.. .- - - - - Ll-0 f$p DFSK- -OFF- RH_ _ { _. 15 ✓ 1 I S C (Z --� �- -L� 1 81 1 LZ 151 - ! I A117 -1 -� NM NI-LH Zf3_ 4 B I 1 L I 1 3 -I— -_ LIB CIRC._—� .per A ! 1 _ All R _—�MUER HS 4 6111' I L - l— ILsJ� fi R R -__-_-- -70 _ _ :RH I I 1 Pl I. PZ I KII AIZI Q Ri _ 7° - f I = gl I "7 I I 1 PI i P2 I KI I AIZ7 RREAli -rU UPS RHr� - �:I -t - -we ---.. - ---- —1.—_ _ T1�C?F� R ID3 I - - - A151 13D_ I LH I 4 1 -� e y L 32 o cu to er 1_ 6I4$ - IU3 - ristr o s. - -- I A 15I 4- L 15 - !I� - 7Q-.ofy- R H Wa 4 FW L 1 } ! _ 1 q gl I L6 I I I Cl I Kl t Nil 1 hS 1 Nil AIL f Ip3 A 61 _ 51 - ! A i- AI5`A 'fLRID2 FRm co . . HMN 15 -4 I - I K1 I I I A_ ISMCIRC �Zl CIRC LN P 157 I 4 I I. TQ21a2MMCI � , wCi A 1Z_ G ! i I 5 AISq At yE _'fD FZR 30 �' 314 LH 4 61 I 1 I 1 Needs electrified lever to connect to card reader f