Loading...
Ordinance No. 15,080 ORDINANCE NO. 15,080 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING THE FIRST AMENDMENT TO THE AGREEMENT FOR CONSULTING SERVICES WITH FREESE AND NICHOLS, INC., TO PERFORM ON-CALL CONSTRUCTION MANAGEMENT SERVICES FOR CITY OF BAYTOWN CIP PROJECTS; AUTHORIZING PAYMENT BY THE CITY OF BAYTOWN IN AN AMOUNT NOT TO EXCEED ONE HUNDRED FORTY THOUSAND AND NO/100 DOLLARS ($140,000.00); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, hereby authorizes and directs the City Manager to execute and the City Clerk to attest to the First Amendment to the Agreement for Consulting Services with Freese and Nichols, Inc., to perform on-call construction management services for City of Baytown CIP Projects. A copy of said amendment is attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Section 2: That the City Council of the City of Baytown authorizes payment to Freese and Nichols, Inc., in an amount not to exceed ONE HUNDRED FORTY THOUSAND AND NO/100 DOLLARS ($140,000.00) for professional services in accordance with the amendment authorized in Section 1 hereinabove. Section 3: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the irmative vote of the City Council of the City of Baytown this the 281h day of April, 202 . RANDON CAPETIL00, Mayor ATTEST: o�epYTOWV l ti Ve SN e • S ANGELA JACKSON, CI k ti Ail••o....••� F or- APPROVED AS TO FORM: T� r TREVOR FANNING, Interim City Attorney R.Karen Anderson ORDINANCES 2022 2022.04.28\AmendmentforOnCallServicesFreeseandNichols.docx EXHIBIT "A" Consulting Services Contract Amendment On-Call CM&I Services Date of Issuance: March 25.2022 Amendment No: 01 Consultant: Freese and Nichols.Inc. Project No: On-Call CM&I Services B PO#: 2200736 BAYTOWN Explanation: This Amendment is a combination of the existing On-Call Engineering Services contract with the consultant Freese and Nichols, Inc. for on call construction management and inspection services. This contract provides staff augmentation. Construction manager will provide assistance as needed to City of Baytown inspection team, construction managers, and project managers on various projects. Task will include but not limited to: participation in progress meetings, management of construction documents, assists with monthly pay applications(review and recommendation),assist with change order coordination,provide assistance./guidance to on-site inspectors during daily site inspection duties. Description of Work Cost Time 1. Additional CM&I Services $ 140,000.00 0 Weeks Total $ 140,000.00 0 Weeks Scope/Schedule: The additional scope of work and the schedule associated with the same, are attached hereto as Exhibit "A" and incorporated herein for all intents and purposes. Cost&Time Change Summarv: L1` Time Original Contract: $ 48,500.00 52 Weeks Previous Amendment(s): $ 0 N!A Weeks Net increase(decrease) from this Amendment: $ 140,000.00 0 Weeks Revised Contract: $ 188,500.00 51 Weeks Design 1 of 2 D6.Revised 11 21 Consultant amees to perform clrange(s) included in this Contract Amendment for the price and time indicated The prices foi changes included all costs associated Nv ith this Contact Amendment No wort: is to be done until this Amendment is executed, No payment to the Consultant shall be made for work included in the Amendment until this Anrendnrent is executed. Unless a different meaning. clearly appears Born the context. words and plu-ases as used it this Amendment. the terms and phrases as used herein shall have the same meanings as in the Agreement The provisions of this Amendment and the Agreement and all precious amendments. if any. shall be read together And construed as one agreement provided that. in the event of any conflict of inconsistency between the pioN ieiorrs of thi, Amendment and the provisions of the agreement and any pieviouus amendment. the provisions of this Amendment .shall control. This Amendment Iras been jointl) negotiated by the parties hereunder and shall not be construed against a party hereunder because that part),may have assumed primary responsibility for the drafting of this Amendment By this Amendment. the C ity does not consent to litigation or suit, and the City hereby expressly revokes an} consent to litigation that it may have granted by the terms of this Amendment.the Aujeeinent or any other contract or agreement of addenda. any charter. or applicable state law. Nothing contained in this Amendment or in the Agreement shall be construed in any way to limit of to waive the C'ity's sovereign inrrrrtunity The persons executing thi,, Agreement hereby represent that each party lia5 the full powei and authority to enter into and perform pursuant to this Amendment. and that each has been properly authorized and empowered to enter into this Amendment Upon execution by all parties, the following changes identified for the Contract Value and/or Contract Time shown, are made pai-t of the Contract. aPPRO APPROVED: By- Date:- B}' Date C'onsuliaut RI['HARD L DAVIS.City i\lanalei Painted Name APPROVED AS TO CONTENT: IK* G AUA?'_ By Date. Title FRaNI K O.SINIONEAUS.M.P E. PXVE Director APPROVED AS TO FUNDING: By _. _ Date: VICTOR BROWNLEES. Finance Duectoi Design 2 of 2 D6. Re%iced 11 21 EXHIBIT A X If T F P BAYTOWN SCOPE OF SERVICES FOR ON CALL CONSTRUCTION MANAGEMENT SERVICES Construction 1 of It D7.Revised 2i 2021 Task Order Authorizations Each On Call Services project shall be authorized as a task order, complete with a brief scope of work, schedule, and project team organization chart, on an as- needed basis. The Consultant shall provide a proposal in response to each solicitation from the City's Project Manager for either a not-to-exceed or a time- and-material proposal. Task Order Authorizations shall be based on the hourly rates set forth in Exhibit - B Fee Schedule. The Task Order will be agreed by City and Consultant in writing and shall be deemed incorporated herein and made a part hereof by reference. The individual work assignments may include, but not be limited to, the following: • Prepare Construction cost estimates; • Attend design, bid, or construction phase meetings as required; • Provide constructability reviews • Perform project management and construction management for roadways, water/wastewater distribution/collection system, lift station or plant modifications and repairs; • Perform construction inspection for roadways, water/wastewater distribution/collection system, lift station or plant modifications and repairs; FEE SCHEDULE -will be shown as Exhibit B to the contract SCHEDULE —will be shown as project specific to each Task order Task Orders will serve as documentation of authorizations. The scope of work that follows is a guide for Construction Management and Inspection Services, and the Task order for each project may differ or specify additional or less work. Construction 2 of 1 I D7.Revised V 2021 BASIC SERVICES: Construction Manager(s) Firm shall render the following professional services to the OWNER in connection with the construction of the Project. 1. Pre-Construction (on specific projects, as requested by the City) 1.1.Provide constructability review of plans, specifications, contract documents and validity of Engineer of Record's project duration. Identify construction issues, conflicts, deficiencies, review the adequacy and accuracy of the design and independent verification of quantities. 1.2.Attend Pre-Bid Meeting; provide feedback to City's Project Manager as necessary, such as: tracking and recording questions for the Engineer's written response, clarifying the Owner's expectations for the project and the project execution. 1.3.Chair Pre-Construction Meeting 1.3.1. Schedule and conduct the pre-construction meeting; record and disseminate minutes from pre-construction meeting. 1.3.2. Utilize the City's Project Management program: set communications protocol and contract administration procedures, establish progress meeting schedule and submittal schedule. 1.3.3. Provide agenda for meeting: Key milestone dates, pay application procedures, schedule, public notification issues and procedures, utility coordination issues, traffic control, permitting, property owner notification and coordination, temporary facilities, contractor's use of City's Project Management program, etc. Construction 3 of 11 D7.Revised 212021 2. Construction Administration and Management Services 2.1.Act as the City's on-site representative administering the contract for construction and providing overall project oversight, maintain record of decisions and changes made. 2.2.Meetings: Schedule and conduct construction progress meetings; record minutes from construction progress meetings and distribute via The City's Project Management program to: City Project Manager, Design Engineer and contractor throughout the duration of the project. 2.2.1. Schedule meetings every two weeks, minimum, to review the following: work progress and schedule, outstanding issues, status of submittals and responses shop drawings unforeseen issues and changes to the work. 2.2.2. Coordinate additional meetings as necessary to discuss and resolve problems and provide guidance in a timely manner. 2.2.3. Coordinate/monitor the following: utility relocation activities for compliance, utility installation verification, reporting, record management and as-built drawings. 2.2.4. Attend all utility coordination, construction, and scheduling meetings. 2.2.5. Obtain copy of ROW permit and prints from Public Works in order to monitor progress of utility relocation per permit/plan. 2.3.Manage Construction 2.3.1. All final documentation is required in electronic/digital format, utilizing The City's Project Management program as is feasible. Construction 4 of 11 D7.Revised 212021 2.3.2. As field problems arise, notify the Design Engineer and City Project Manager of proposed solutions to resolve problems. 2.3.3. Review and update as-built documents regularly with contractor. 2.3.4. Monitor and ensure adherence to approved project baseline schedule. Review contractor's schedule monthly, ensure compliance with City's intended schedule, and provide recommendations as needed to retain and regain schedule if needed. 2.3.5. Recommend alternate project sequencing/scheduling to keep project on schedule. 2.3.6. Prepare monthly summary report of construction activities with outstanding issues outlined for review. Monthly progress information associated with the project will be submitted to the Project Manager for review and approval. 2.3.7. Record weather conditions on jobsite daily. 2.4.Coordinate work of contractor with external agencies and utility companies. Coordinate contractor's operations with regard to other City contracts and construction as well as with property owners for planned service outages, street closures, and access control issues to properties including notifications. 2.4.1. Verify construction conformance and compliance with TCEQ, NOI and NOT. 2.4.2. Verify construction conformance with permitted activities such as: City of Pearland permits, U.S. Army Corps of Engineers permits, TxDOT roadway permits, and any Railroad agreements. 2.5.Maintain records of all decisions, actions and activities with regard to construction operations via the City's The City's Project Construction 5 of 11 D7.Revised 2/2021 Management program system (i.e. Change Orders, RFIs and responses, Submittals and responses, Request for Proposals, correspondence, SWPPP inspections.) 3. Construction Inspection Services 3.1.Provide full-time on-site technical observation of Contractor's activities to verify and ensure all work materials, structures, equipment and workmanship comply with the Contract Documents including Addenda, and Change Orders. Verify and ensure that Contractor maintains good construction practices and professional standards prevailing in the local City, County, and State of Texas. Utilize City's Project Management program for all inspection reports. 3.1.1. Notify the City Project Manager if Contractor's work is not in compliance with the Contract Documents or specifications. Notify the City Project Manager and Design Engineer of any failure of the Contractor to take measures to repair and bring work in compliance. 3.1.2. Issue Advisory Notices to Contractor for work that is not in compliance with approved construction documents. 3.1.3. Issue Non-Compliance Reports to Contractor if non- conforming work is not brought into compliance or if plan of action to bring work into compliance is not conducted in timely manner. 3.1.4. Inspect and observe the materials and equipment being incorporated into the work to assure that they are handled, stored and installed in accordance with Construction 6 of 11 D7.Revised 212021 the Contract Documents and specifications. Report to the City Project Manager regarding these activities. 3.2.Identify, record and notify Design Engineer of any problems or failures to meet performance requirements in a timely manner to minimize delay in the progress of the project, make recommendations) for appropriate solution to the City Project Manager and Design Engineer. 3.3.Prepare and maintain daily progress log or daily construction reports, photographs, records and track quantities installed that day utilizing the City's Project Management system. 3.4.Ensure contractor reviews and approves daily reports and quantities. 3.5.Verify contractor has obtained necessary permits and is maintaining any Traffic Control, public notification and Storm Water Pollution Prevention Plans, facilities, equipment or arrangements in accordance with contract documents. 3.6.Attend and participate in progress meetings. 3.7.Create contacts for your record for: names, addresses, telephone numbers and email of all contractors, subcontractors, sub consultants and major suppliers of material and equipment; store in City's The City's Project Management program system. 3.8.Immediately notify the City Project Manager and Design Engineer in the event of an on-site accident. Record and note conditions, activities and witnesses to the event. 3.9. Maintain Resolution Log and respond to citizen complaints in The City's Project Management program system. 3.10. Consult with City Project Manager and Design Engineer in advance of scheduled major work operations, tests, inspections or start of important phases of project. Construction 7 of l I D7.Revised 2'2021 4. Pay Applications 4.1.Pay applications will be generated by the City's The City's Project Management program system based on quantities approved in the daily reports. Review and verify quantities provided by contractor for all work in compliance with contract documents. 4.1.1. Review work conducted daily on daily inspection reports and material installed measurements submitted by contractor; verify work conducted and bid item quantities via The City's Project Management program; meet monthly to review pay estimate and quantities with contractor 4.1.2. Review progress pay application with Design Engineer for approval or revision prior to submittal to City. 4.1.3. Finalize pay application with signatures from Contractor, Engineer and Construction Manager certifying quantities and amounts via The City's Project Management program. 4.1.4. Notify City Project Manager when all electronic signatures are completed in the The City's Project Management program system for invoice processing. 4.1.5. Track and record requests for rain or other delays with potential to add to Contract Time in Daily Reports in The City's Project Management program. 4.1.6. Provide an independent quantity forecast bid items to identify potential quantity over-runs as part of pay estimate review. 4.2.Upon completion of the work, prepare a final progress payment including a balancing change order zeroing out all unused quantities utilizing The City's Project Management program. Identify Construction 8 of 11 D7.Revised 212021 and add additional quantities and make any approved changes to the Contract Time. 4.2.1. Review and coordinate with Design Engineer to provide Engineer's recommendation for Substantial Completion or Final Acceptance. (See Close-out Section) 5. Document Control 5.1.Utilize the City's Project Management program system to: receive, route, track and log all Contractor communications, Submittals, Change Orders, RFIs, Pay Applications and Citizen Complaint/Resolution Log; communicate with Contractor the status of submittal reviews; review submittal and RFI log in The City's Project Management program to ensure timely responses; notify City Project Manager, Contractor and Design Engineer of time critical issues. 5.1.1. Respond to RFIs when such response does not require the Engineer's opinion or expertise or direction from City. 5.1.2. Assemble and maintain notes, comments, sketches and supportive data relative to the Project to facilitate the revision of drawings to conform to the final as-built conditions. Review Contractor's record keeping periodically to ensure completeness, timeliness and progress. 6. Change Orders 6.1.Prepare and issue request for proposals in a timely manner via The City's Project Management program. Review RFP and contractor proposal for additional work with City Project Manager and Design Engineer for approval. Ensure the status of RFP and Responses Construction 9 of 11 D7.Revised 212021 from Contractor, City and Design Engineer are logged and tracked in the The City's Project Management program system. 6.2.Provide recommendation on technical matters as an advocate for the City. Evaluate Contractor's response/proposal for merit, cost, time, accuracy and price practicality. Negotiate with Contractor on City's behalf if required. 6.3.Prepare Change Order and documentation including signatures of Contractor, Engineer and Construction Manager for delivery to City. 7. Testing Laboratory and Results 7.1.Coordinate testing laboratory activities with Contractor's activities. Review test reports for compliance with Contract Documents. Log, track and retain test reports in The City's Project Management program. Review results with Contractor. Monitor any corrective action and re-testing for compliance. Maintain compliance with City's specifications 7.1.1. Review lab test reports and log any failures. 7.1.2. Review Invoicing from Laboratory to daily activities. 8. Project Completion and Close out 8.1 Provide list of deliverables for substantial completion walk through/inspection. Schedule and conduct project walk through upon receipt of Contractor's notification of substantial completion. Include City Project Manager, Design Engineer and others as directed. Prepare a list of non-conforming work based on visual inspections via The City's Project Management program. Record and monitor contractor's corrective efforts and schedule. Schedule final completion inspection for any remaining corrections. 8.2 Coordinate and obtain Design Engineer's signature and seal on Substantial Completion certificate and Final Completion and Acceptance certificate via The City's Project Management program. Construction 10 of 11 D7.Revised 2 2021 8.3 Review and compile any Operation and Maintenance documents required from the Contractor—forward to Engineer for review. Ensure Contractor's closeout documents are uploaded to The City's Project Management program. Review for completeness and accuracy, including; affidavits of final payment, final pay estimates, as built records, redlines and drawings. Once received, notify the Design Engineer and City Project Manager when completed. 8.3.1. Upon completion of close out items, provide recommendation for City's Substantial Completion/Final Acceptance certificate. 8.3.2 Provide indexed project files, redline plans and as-built or record drawings to City via The City's Project Management program. 8.4 Conduct Project Close-Out Meeting. 8.5 Prepare and recommend final payment application. (Prepare job record logs transmittals, and correspondence reports in an organized file for delivery to City.) 8.6 Consult with City on any potential Warranty items requiring repair or replacement. 9. Warranty Period 9.1 Schedule, arrange and coordinate a One Year Walk-through of the project to review status of the work 30 days prior to expiration of the One Year Maintenance period. 9.2 Provide staff to conduct and participate in the warranty inspections. 9.3 Prepare list of non-conforming work for presentation to the City Project Manager, Design Engineer and Contractor via The City's Project Management program. 9.4.Oversee repairs for non-conforming work with Contractor. 9.5. Submit final report on completed warranty repairs via The City's Project Management program. Construction 11 of 11 D7.Revised 2 2021 EXHIBIT B- FEE SCHEDULE COMPENSATION Compensation to FNI shall be computed on the basis of the following Schedule of Charges and the Task Authorizations as assigned. Position Max Hourly Rate Professional 1 107 Professional 2 130 Professional 3 146 Professional 4 169 Professional 5 197 Professional 6 225 Construction Manager 1 97 Construction Manager 2 120 Construction Manager 3 131 Construction Manager 4 164 Construction Manager 5 197 Construction Manager 6 225 Construction Representative 1 87 Construction Representative 2 97 Construction Representative 3 120 Construction Representative 4 131 CAD Technician/Designer 1 91 CAD Technician/Designer 2 117 CAD Technician/Designer 3 145 Corporate Project Support 1 87 Corporate Project Support 2 105 Corporate Project Support 3 139 Intern/Coop 53 Senior Advisor 175 Rates for In-House Services and Equipment Mileage Bulk Printing and Reproduction Equipment Standard IRS Rates B&W Color Valve Crew Vehicle(hour) $75 Small Format(per copy) $0.10 $0.25 Pressure Data Logger(each) $100 Tech Charges Large Format(per sq.ft.) Water Quality Meter(per day) $100 8.50 per hour Bond $0.25 $0.75 Microscope(each) $150 Glossy/Mylar $0.75 $1.25 Pressure Recorder(per day) $200 Vinyl/Adhesive $1.50 $2.00 Ultrasonic Thickness Guage(per day) $275 Coating Inspection Kit(per day) $275 Mounting(per sq.ft.) $2.00 Flushing/Cfactor(each) $500 Binding(per binding) $0.25 Backpack Electrofisher(each) $1,000 Survey Grade Standard Drone(per day) $200 $100 GPS(per day) $150 $50 OTHER DIRECT EXPENSES: Other direct expenses are reimbursed at actual cost times a multiplier of 1.0. They include outside printing and reproduction expense, communication expense, travel, transportation and subsistence away from the FNI office. For other miscellaneous expenses directly related to the work, including costs of laboratory analysis, test, and other work required to be done by independent persons other than staff members,these services will be billed at a cost times a multipler of 1.15. For Resident Representative services performed by non-FNI employees and CAD services performed In-house by non-FNI employees where FNI provides workspace and equipment to perform such services,these services will be billed at cost times a multiplier of 2.0. This markup approximates the cost to FNI if an FNI employee was performing the same or similar services. These ranges and/or rates will be adjusted annually in February. Last updated February 2021. 1CS092021 Exhibit B City of Baytown Project Fee Summary Project Fee Summary On-Call CM81 Basic Services $ 48,500 Basic Services 48,500 10/7/2021 Special Services $ - Special Services - Detailed Cost Breakdown Total Project $ 48,500 Total Project I 48,500 Labor Expenses Task Description CMorMid•L.M Total Hours Total Labor Tech Charge Miles B&W(sheet) Lead CM Inn—to, Inspector Effort $164 $120 $97 $ Contract Administration 10 10 $ 1,706 10 Meetings(Precon,Progress,Field) 10 5 5 _ 20 $ 2,834 10' 800 Document Coordination 10 10 $ 1,706 10 Submittal Distribution,Review,and Follow-up: 5 5 10 $ 1,128 i RFI coordination,review,and follow-up 5 5 10 $ 1,128 _ Process pay estimates 6 2 2 — 10 _ $ 1,475 6 W Change Orders,Proposed Change Orders 8 8 $ 1,364 8 Coordination of Testing Activities 10 10 _ 20 $ 2,257 Preliminary-Walkthrough/Punchlisl 4 4 4 12 $ 1,585 4 Substantial Completion-Walkthrough/Punchlist 4 4 4 12 $ 1,585 4 Final Inspection-Walkthrough 4 4 4 12 $ 1,585 4 Project Closeout package 4 2 2 8 $ 1,134 4 Warranty Inspection&Reporting 4 4 8 $ 903 On-site Inspection 115 115 230 $ 25,953 2,800 Total Hours/Quantity 601 1601 1601 380 60 2,800 800 Total Effort $ 10.2341 $ 19,9681 $ 16,141 1 $ $ 46,342 $ 510 J $ 1,568 $ 80 Exhibit B-Level of Effort City of Baytown 4W Pro of Foe Summa Amendment No.1 0412022-0912022(6-hrlday)NTE$140,000.00 Labor Services $ _ !14 1 43/1812022 ExpensesS 8 543 Detailed Cost Breakdown Total Project S o.000 Tasks Labor Expenses swx N—W awmw wrm eon Lu Basic or Total Labor Total Expanse Phase Task Special Task Description pht+cm cm cm Total Hours Effort Tech Charge Was other Effort 5164.00 $164.00 S731.00 _ Basis:5da shMc Bhrs/da $ _ Contract Administration 10 120 2 132 $ 21582 132. $ 1,122 _ Meet in s re on,Progress,Fie 180 4 184 $ 30,044 184+_ S 1,564 Document Coordination _ $ $ Submittal Distribution,Review,and Follow-up ' 24 1 25 $ 4.067 25 $ 213 RFI coordination,review,end follow-up 24 1 25 $ 4.067 25 $ 213 Process pay estimates _ 60 2 62 $ 10.T61 W_� $ 527 ' Chan6e Orders,Pro sed Change Orders T 30 1 31 $ 5.051 31 $ 264 Coordination of Testing Activities 10 10 $ 1.640 tot0 S 85 •Preliminary-WaikthroughlPunchlist " 20 2 22 $ 3542 22 $ 187 Substantial Completion-WalkUroughlPunehlnt 18 2 20 $ _ 3,214 20 $ 170 Final lns etion-Walkthrough 16 1 19 S 3.083 19 $ 162 Project Closeout package 10 10 $ 1,640 10 $ 85 Warranty Inspection 8 Reporting 16 1 17 $ 2,755 17 _ $ _ 145 �On-sife Inspection 240 10 250 $ 40.670 250•• 2,877 S 3808 Total Hours/quantity 10 770 27.0 907.0 0 2,877 - Total Effort S - S 1 840,00 $128 280,00 S 3 537.00 $ 131.4 77.00 $ 6,859.50 $ 1,683.05 $ S 8,542.55 EXHIBIT C - SCHEDULE Time schedule for construction management is on call as needed for 52 weeks, commencing on the date specified in the notice to proceed for Construction.