Loading...
Ordinance No. 15,079 ORDINANCE NO. 15,079 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS, AUTHORIZING CHANGE ORDER NO. 7 TO THE ANIMAL SERVICES AND ADOPTION SHELTER PROJECT WITH CONSTRUCTION MASTERS OF HOUSTON, INC., IN AN AMOUNT NOT TO EXCEED FORTY- SEVEN THOUSAND SEVENTY AND 781100 DOLLARS ($47,070.78); AND PROVIDING FOR THE EFFECTIVE DATE THEREOF. ****************************************************************************** BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF BAYTOWN, TEXAS: Section 1: That the City Council of the City of Baytown, Texas, does hereby authorize Change Order No. 7 to the Animal Services and Adoption Shelter Project with Construction Masters of Houston, Inc., in an amount not to exceed FORTY-SEVEN THOUSAND SEVENTY AND 78'100 DOLLARS ($47,070.78). A copy of said change order is attached hereto, marked Exhibit "A" and made a part hereof for all intents and purposes. Section 2: This ordinance shall take effect immediately from and after its passage by the City Council of the City of Baytown. INTRODUCED, READ and PASSED by the affirmative vote of the City Council of the City of Baytown this the 28"' day of April, 2022. NDON CAP ILL , Mayor ATTEST: �oF eNYTOWV r F ; ° e � aN ® 8 ° ANGELA,3JACKSON, City %-% °e CD -1TF 0 0" APPROVED AS TO FORM: 1 TREVOR FANNING, Interim City Attorney R:1Karen Anderson\ORDINANCES'•2022,.2022.04.28.ChangeOrderNo7-AntmalServicesandAdoptionShelter docx EXHIBIT "All CITY OFBAYTOWN PUBLIC WORKS&ENGINEERING -- -� 2123 Market St. Baytown,Texas 77520 BMTOWN CHANGE ORDER Animal Services and Adoption Shelter Date of Issuance: 4114/2022 Change Order No.: 7 Contractor: Construction Masters of Houston CoB Project No.: FA1903 Designer: Quorum P.O.No.: 2009472 Explanation: This change order encompasses the following: CO 7.1: Add an cellular autodialer and antenna for building fire monitoring services. CO 7.2: Revise the sidewalk on the east side of the east side of the building by covered play yards between door 108A(Training Room)and 143C(Hallway)so that it drains away from building and meets ADA requirements. CO 7.3:Add required finish trim(nichiha masonry)at entry ceiling for the canopy to ensure an complete and finished appearance and weather proof seal, CO T+Add drywall ceiling to entry lobby to hide the structural components of the building for a complete finished presentation and add sound attenuation, CO 7-5:Add millwork to Room 107 that will serve as office work spaces for staff CO 7-6:Add a breaker and wire to provide power to dry sprinkler pump to meet fire sprinkler requirements. CO 7.7:Electrical allowance for conduits and boxes needed by IT for gates and sensor. Description of Work Cost Time 7.1 Add cell auto dialer and antenna for fire monitoring $ 2,445.70 0 Days 72 Revise sidewalk on eastside of building between door 108A (Hallway)and 143C(Training Room) $ 3,361.92 0 Days 73 Add trim at nichiha entry canopy $ 1,478,70 0 Days 74 Add drywall ceiling to lobby area $ 18,437.48 0 Days 7 5 Add millwork spaces to Room 107 $ 13,535,03 0 Days 7 6 Add breaker and wire to provide power to sprinkler pump $ 2,483-20 0 Days 7.7 Add electrical allowance for conduits and boxes needed by IT $ 5,328.75 0 Days Total $ 47,070.78 Please attach back-up documentation Cost&Time Change Summary Cost Time Original Contract: $ 6,532,983.73 494 Days Previous Change Order(s): $ 207,347-31 0 Days Contract prior to this change order: $ 6,740,331-04 0 Days Net increase(decrease)from this change order $ 47,070,78 0 Days Revised Contract: $ 6,787,401.82 494 Days Finance Approval- Date: RECOMMENDED: RECOMMENDED. '`� � ►� Date 4/14/22 By: By ��­� �.-Date 04/14/2022 Design Engineer/Architect Director of Public Works&Engineering ACCEPTED': APPROVED: By: vy(;�� Date: 4/14/22 By: Date Contractor Qry Manager *Contractor agrees to perform change(s)included in this Change Order for the price and time indicated The prices for changes included all costs asset rated with Otis Change Order No work is to be done until this change order is executed No payment to the Contractor(or Consultant)shall be made for work included in the chan_u,e order until the Contractor s pay estimate is updated Revise the project plans and specifications as referenced and insofar as the original project drawings and specifications are inconsistent this Change Order governs Upon execution by all parties the following changes identified for die contract value and/or contract time shown are made part of the contract Construction 1 of 1 D16 Revised 2021 ONSTRUCTION ASTERS OFHOUSTON, INC. P.O. Box 1587 - Pearland, Texas 77588 - 281/997-2640 - Fax: 281 485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 3/28/22 Change Proposal No: 14 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials and supervision for an Cell Dialer and Antenna. ADT $ 2,294.82 Subtotal $ 2,294.82 OH&P $ 114.74 Additional Bond Premium (2.5%up to$100K; 1.5%up to$500K) $ 36.14 Total Change Proposal Request $ 2,445.70 Additional Time Requested: None Reason: Owners Request Attachments: ADT Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com r Commercial :Change Order Date: 3/21/2022 COM Cell Dialer To: Construction Masters Project: Baytown Animal Shelter P. O. Box 1587 Pearland,TX 77588 Attn: Adrian Guerra From: Sam Hartsfield 832-455-3706 ADT Commerical is pleased to provide this proposal for your consideration This quotation shall remain firm for a period of forty-five(45)days from the proposal date,and price is based upon delivery of equipment within three 13)months. ADT Commercial payment terms are net 30. Scope of • Installation of Cell Dialer and antenna. Total Price: $ 2,294.82 Accepted By: Date: e Katy Commercial Change Order#Cell Dialer Commercial East St. Katy,Texas 7749393 Phone:(281)347-7973 Fax:(281)347-7975 Change Order Date: March 21,2022 To: Construction Masters Project Into: 2401 Market Street Project: Baytown Animal Shelter Address: Baytown,Texas 77520 Customer: Baytown Animal Shelter _ Address: 705 N.Robert C.Clanier Dr. Baytown,TX 77521 ATTN: Adrian Guerra Material City Mfg Part No. escr p on Unit Price L TOTAL 1 Cell Dialer 0 $ 336.25 $ 336.25 1 Cable $ 238.74 $ 238.74 Material Subtotal $ 574.99 Labor Hours Classification Description link Price 16 Installer $ 80.00 $ 1,280.00 0 Specailist $ 101.33 $ - 4 Project Management $ 101.33 $ 405.33 0 Design $ 101.33 $ - $ Labor Subtotal $ 1,685.33 Shipping $ 34.50 Subtotal $ 2,294.82 Tax Rate(s) 1 0.00% $ - Tax Exempt TOTAL $ 2,294.82 Accepted By: Date: For pricing questions please contact your local sales representative or project manager at(281)347-7973 ON STRUCTION ASTERS OF HOUSTON, INC. P.O. Box 1587— Pearland, Texas 77588 - 281i997-2640— Fax: 281 485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 4/13/22 Change Proposal No: 15R To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials and supervision for requested sidewalk changes. TNT $ 3,154.51 Subtotal $ 3,154.51 OH&P $ 157.73 Additional Bond Premium (2.5%up to$100K; 1.5%up to$500K) $ 49.68 Total Change Proposal Request $ 3,361.92 Additional Time Requested: Scope: 1. Removal of sidewalk on eastside on the building between door 108A &143C. 2. Repour Sidewalk @ FF elevation holding of building 1-1'2" 3. Install Pea Gravel between building and sidewalk. Reason: Owners Request Attachments: T&T Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com T&T CONSTRUCTION Estimate ON SOLID GROUND. Date Estimate# 204 Preston Ave. Pasadena,TX 77503 3/28/2022 1276 713-477-6660 Name/Address Construction Masters of Houston,Inc 3908 3rd St. Pearland,TX 77581 USA Rep — BTW Scope of Work Total RE:Baytown Animal--Change Order#04-- Sidewalk Replacement -SIDEWALK REPLACEMENT 3,154.51 -Includes-(sa%%cut,demo and pour back for sidewalk replacement) Accepted By: Date: Sales Tax (8.25%) $0.00 Please contact Ben Weathers a.713-305-7712 or%is e-mail at Total $3,1S4.S1 Ben.Weathers.c_l tandtconstruction.com ONSTRUCTION ASTERS OF HOUSTON, INC. P.O. Box 1587 Pearland,Texas 77588 - 281:997-2640 - Fax: 281 485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 3/26/22 Change Proposal No: 16 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials and supervision for requested trim details changes at Nichiha and Entry Ceilings. Upchurch Kimbrough $ 791.06 MBCI $ 296.41 CM - Labor fo MBCI Trim $ 300.00 Subtotal $ 1,387.47 OH&P $ 69.37 Additional Bond Premium(2.5%up to$100K; 1.5%up to$500K) $ 21.85 Total Change Proposal Request $ 1,478.70 Additional Time Requested: Scope: 1. Added trim at corners and base. 2. Added trim at drop ceiling and Nichiha. Clarification: Nichiha Black and MBCI Coal Black will be the trim colors used. Reason: Architects Request Attachments: MBCI, Upchurch Kimbrough Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com 'A UPCHURCH KiMBROUGH COMPANY 1� ° �■ SPECIALISTS IN ARCHITECTURAL BUILDING PRODUCTS a 7401 Westview,Houston,Texas 77055 Ph:713-957-1520 FAX: 713-957-1268 www.upchurchkimbrough.com Revised No: 3 Order Acknowledgement Date 2/17/2021 Revised Date 3/24/22 S.O. No. 8929 To Ship To CONSTRUCTION MASTERS OF HOUSTON,INC. CONSTRUCTION MASTERS OF HOUSTON,INC. 3908 THIRD ST. BAYTOWN ANIMAL SHELTER PEARLAND,TX 77581 705 N.ROBERT C.LANIER DRIVE BAYTOWN,TX 77521 P.O. No. Via Rep Cust PO: Terms: 32150 FLAT BED TRUCK RK/SC Net 30 Architect: OUT OF TOWN(RK) Gen Contr: CONSTRUCTION MASTERS OF HOUSGust Need Date: 11/1/2021 Quantity Description Unit Price U/M Extension 20 VINTAGE WOOD-3030 REDWOOD EPC765F 163.61 /EA 3,272.20 5 VINTAGE WOOD 3"FACTORY CORNER REDWOOD 176.97 /EA 884.85 6PCS/BOX REPC765FM 2 I0MM STARTER TRACK 10'- 1 OPCS PER BOX FA700 162.50 /EA 325.00 2 IOMM DOUBLE FLANGE SEALANT BACKER 10' 10 81.25 /EA 162.50 PCS/BOX FH1015R 1 IOMM SINGLE FLANGE SEALANT BACKER 642' 58.99 /EA 58.99 IOPCS/BOX FHKI015R 5 PANEL CLIP FOR 16MM PANEL W/JOINTER(30 229.28 /EA 1.146.40 CLIPS/BOX)JEL-778 IOMM CORRUGATED SHIM 4'50PCS/BOX FS1010 166.95 /EA 166.95 5 CORNER CLIP 777C 6 EACH/BOX USE 1 CLIP PER 13.36 /EA 66.80 FACTORY CORNER **REVISED 08/12/2021 TO UPDATE PRICING&NEED DATE/SO** **REVI. D 9/&2 t TO CI{ANQE)3UY) R PER SO/MK** **ADD'N 3/24122** I DECORATIVE STARTER BLACK FTD4788 209.62 LA 209.62 SUbtGtal *If material is delivered via Flat Bed Truck or Motor Freight;customer is responsible to unload. Please Sign Belo%%as approval of material and quantities stated.Return Signed Copy. Sales Tax (0.0%) Authorized Company Signature Total Deliver) subject to approval of production run samples and trucking schedules. **t'K NVILL PROVIDE 16/SF OF Orders are not subject to cancellations without seller's express written consent.No material may be STANDARD MATERIAL FOR returned for credit.This includes any material ordered in excess or by mistake. SAMPLES AT NO CHARGE.ANY If credit application is pending,this order is subject to credit approval. CUSTOM MATERIAL SAMPLES REQt'IRED WILL BE DEDUCTED Sales tax will be added if exemption certificate is not furnished. FROM THE ORDER AND BILLED AT This order is accepted subject to Upchurch Kimbrough Company's Terms and Conditions of sale. TIME OF SHIPMENT.** Thank You, Page 1 j� UPCHURCH KiMBROUGH COMPANY �■ SPECIALISTS IN ARCHITECTURAL BUILDING PRODUCTS 7401 Westview,Houston,Texas 77055 Ph:713-957-1520 FAX:713-957-1268 www.upchurchkimbrough.com Revised No: 3 Order Acknowledgement Date 2117/2021 Revised Date 3 2422 S.O. No. 8929 To Ship To CONSTRUCTION MASTERS OF HOUSTON,INC. CONSTRUCTION MASTERS OF HOUSTON,INC. 3908 THIRD ST. BAYTOWN ANIMAL SHELTER PEARLAND.TX 77581 705 N.ROBERT C.LANIER DRIVE BAYTOWN,TX 77521 P.O. No. Via Rep Cust PO: Terms: 32150 FLAT BED TRUCK RK/SC Net 30 Architect: OUT OF TOWN(RK) Gen Contr: CONSTRUCTION MASTERS OF HOUSGus Negd_ aje; ... I 1 Quantity Description Unit Price U/M Extension I J MOLD HARDWARE ED680F RAVEN MTJM-RAVEN 297.06 IEA 297.06 2 PORTER COCHERE TRIM BLACK JOH7288 109.69 /EA 219.38 FREIGHT 65.00 /EA 65.00 } **REVISED 3/24/22 TO DO ABOVE ADDN PI.R ADRIAN/MK** Subtotal $6.874.75 *If material is delivered via Flat Bed Truck or Motor Freight;customer is responsible to unload. Please Sign Below as approval of material and quantities stated.Return Signed Copy. Sales Tax (0.0%) $0.00 Authorized Company Signature Total $6,874.75 Delivery subject to approval of production run samples and trucking schedules. **t K WILL PROVIDE 16/SF OF Orders are not subject to cancellations without seller's express written consent.No material ma) be STANDARD MATERIAL FOR returned for credit.This includes an} material ordered in excess or by mistake. SAMPLES AT NO CHARGE.ANY If credit application is pending,this order is subject to credit approval. CUSTOM MATERIAL SAMPLES REQUIRED WILL BE DEDUCTED Sales tax will be added if exemption certificate is not furnished. FROM THE ORDER AND BILLED AT This order is accepted subject to Upchurch Kimbrough Compan)'s Terms and Conditions of sale. TIME OF SHIPMENT.** Thank You, Page 2 SALES ORDER QUOTE Meal Building Components is not responsible for compliance with pans and specifications.MBCI makes no warranties express or implied as to the merchantability Q. or fitness for any particular purpose of these products. 14031 WEST HARDY MBCI's Standard Terms and Conditions of Sale are a part of th s quotalionlorder.The final acceptance or rejection of this quotationlonder shall be made by an authorized PO BOX 38217 MBCI employee or agent. HOUSTON,TX 77060-5304 Price is subject to changed not ordered within five days from the dale of 281 445-8555 this quote and shipped within ten days from the date the order is received by MBCI subject to availability and standard MBCI lead times. MBCI is not responsible for the determination of the 0.0 quanUties/gaugesAength/colors etc.required OLD TO:17575 MINI REGION:0424A Your signature hereon constitutes an open order CONSTRUCTION MASTERS OF HOUSTON 01 to MBCI. B S I CONSTRUCTION MASTERS OF HOUSTON 01 H CONSTRUCTION MASTERS OF HOUSTON 01 L 3908 3RD ST I CPU L PEARLAND,TX 77581 P 14031 WEST HARDY T T HOUSTON,TX 77060 281-997-2640 O O DATE OF ORDER LOAD DATE CUSTOMER P.O./ORDERED BY SALES COORDINATOR TERMS ORDER NUMBER 28-MAR-22 QUOTE G.Vargas 001 1/2%10,NET 30 6634759 REF# DESCRIPTION Ga COLOR Qty SHEET SHP MFG SQ.FT TOTAL UNIT OPT AMOUNT LENGTH PLT. PLT. PER SQ.FT. PRICE PRICE SHEET OF MATL 1 SP24 SPECIAL 24 C-BLACK 2 12'-0" 001 001 8.00 16.00 3.77 1.60 61.92 _1_0_8"_4X4 2 SP24 SPECIAL 24 C-BLACK 4 12'-0" 001 001 15.12 60.50 3.77 6.40 234.49 _2_015-1/8" CH 3 CH F_RT OS CARRIER 1 001 001 0.00 0.00 0.00 4 CH FUEL SURCHG OS 1 001 001 0.00 0.00 0.00 CARRIER 5 CH SPECIAL 1 001 001 0.00 0.00 0.00 PACKAGING Please note that due to current escalating prices and manufacturing capacities the price generated is subject to change.Please refer to pricing on your final confirmation copy sent at time of the order acceptance. ............................................................................................. To assist in customer safety,we reserve the right not to load material on or in any vehicle that we reasonably believe could be considered unsafe or exceed legal standards,including but not limited to length(overhang)and weight regulations or restrictions. It is the customer responsibility to provide transportation which will accommodate the material and meet all safety regulations and legal requirements. It is the responsibility of the customer to tie-down and secure all loads prior to leaving the MBCI facility. MBCI does not provide material for securing loads. ............................................................................................. CUSTOMER JOB NAME/# ESTIMATED SHIPPING WT Baytown Animal Shelter 74.6946 SHIP VIA:CPU I MARKET CODE:MISC NON-TAXABLE ITEMS 0.00 A CARRYING CHARGE OF.833%PER MONTH(10%PER ANNUM)WALL BE CHARGED ON PAST DUE ACCOUNTS AND A TAXABLE ITEMS 296A1 REASONABLE ATTORNEYS FEES IF THIS ACCOUNT IS PLACED FOR COLLECTION.ALL INVOICES DUE AND PAYABLE IN HOUSTON,HARRIS COUNTY,TEXAS.ALL FREIGHT F 0.8 SHIPPING POINT. SUBTOTAL OF ALL ITEMS 296.41 FOR COMPLETE PERFORMANCE SPECIFICATIONS.PRODUCT LIMITATIONS AND DISCLAIMERS,PLEASE CONSULT MBCI'S 91 5n PAINT AND GALVALUME PLUS WARRANTIES UPON RECEIPT OF PAYMENT IN FULL,THESE WARRANTIES ARE AVAILABLE UPON REQUEST FOR ALL PAINTED OR GALVALUME PLUS;PRIME PRODUCTS. CITY TAX @0.00 0.00 Copies can be found at w rnbci.com or contact your local MBCI Sales Representative. TOTAL AMOUNT OF ORDER 320.87 Printed:03/28/202212:38:34 MBCI—QUOTE DEPOSIT 0.00 Page 1 of 1 TOTAL AMOUNT DUE 1 320.87 I III II I IIII II I II IIII I(I I I I IIIII III I I I I IIIII III I II II ONSTRUCTION ASTERS OF HOUSTON, INC. P.O. Box 1587 -- Pearland, Texas 77588 - 281/997-2640—Fax: 281 /485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 4/8/22 Change Proposal No: 17 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to rovide labor, materials and supervision for requested lobby ceiling changes. CMHOU -Lift/Floor Protection/Clean Up $ 1,650.00 Ft Bend Drywall $ 10,650.00 FBS $ 1,150.00 LG Electrical $ 2,750.00 Koetter Fire $ 650.00 ADT $ 450.00 Subtotal $ 17,300.00 OH&P $ 865.00 Additional Bond Premium (2.5%up to$100K; 1.5%up to$500K) $ 272.48 Total Change Proposal Request $ 18,437.48 Additional Time Requested: Work will take 3 to 4 weeks after approval. Scope: 1. Cover Floor 2. Remove all Electrical and FA devices 3. Add 1-1/2 furring channel to existing purlins. 4. Install 5/8 gypsum and tape N float. 5. Prime and 2 coats of paint. 6. Rework Sprinkler Heads 7. Reinstall Lighting and FA devices. 8. Clean Up Clarification: Lobby Clouds are on hold until this is approved and completed. Pricing is based on building lobby being closed while work is being preformed during normal working hours. Reason: Owners Request Attachments: Ft Bend Drywall, FBS, LG Electrical, ADT and Koetter Fire Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com Fort Bend Drywall, LLC 3014 The Highlands Drive, Sugar Land,Texas 77478 Phone: 713-702-7258 Fax: 281-605-5869 Date: Wednesday,April 6, 2022 Job No.: Proposal to: Construction Masters of Houston Project: Baytown Animal Services Dennis Busby 705 N Robert C Lanier Drive 3908 3rd street Baytown, Pearland, Texas 77581 Lobby Ceiling Change Proposal Plans Date Wednesday,April 6, 2022 Phone: 281-997-2640 Fax: 281-485-4702 We appreciate the opportunity to bid on this project. This proposal is based on normal working hours and uninterrupted conditions while working as close as possible with other trades. Price is valid for 30(thirty)days. All bonding is excluded. General Contractor to furnish one set of construction drawings and documents. SCOPE OF WORK: 09250 Drywall: 10,650,00 Lobby area Install furring channels to existing Z purlins over insulation Install 1 layer sheetrock and level 4 finish Man Lift Supplied by GC Cleanup for above BASE BID AMOUNT 10,650.00 Thank You Mike Pant PROPOSSAL CONSTRUCTION DATE:4-8-2022 JOB NAME: Baytown Animal Control JOB#: JOB ADDRESS: 705 N.Robert Lanier Drive TO: Construction Masters of Houston,Inc. Attention:Dennis Busby Address: Phone: (281)997-2640 EMAIL: Dennis@cmhou.com PROPOSAL SUMMARY FBS CONSTRUCTION is pleased to present the following requested pricing for lobby ceiling.Prime and 2 coats of paint.Total$1,150.00 INCLUSIONS PTD WALLS,PTD FRAMES, PTD SOUND PANELS APPLY 1 COAT OF PRIMER 2 COATS OF FINISH PICK UP DAILY TRASH AND THROW IN GC PROVIDED DUMPSTER EXCLUSIONS ANYTHING NOT LISTED ABOVE e.g.(demo,exposed structure,etc.) QUALIFICATIONS This proposal is valid for 30 days from the above date.DUE TO MATERIAL ESCALATION We look forward to working with you on this project. If you have any questions,please do not hesitate to call. OWNER:FREDDY VALENCIA ESTIMATOR:ROBERT MARTINEZ EMAIL:freddy@fbs-construction.com robert@fbs-construction.com 281-904-9161 281-969-6455 Thank you for your business! ELECTRICAL SERVICES 132og Ann Louise Rd. Houston,TX 77086 Phone(281)272 9130 Fax(832)230 0170 TECL#22275 HUB#1205233681000 CHANGE ORDER PROPOSAL Date: 04/08/2022 Proposal#LG5308-CO8 BAYTOWN ANIMAL HOSPITAL BAYTOWN, TX We hereby propose to furnish and install the following: 1. Dissemble and remove installed lighting in lobby. 2. Reinstall lighting after sheetrock and painting is complete. 3. Conduit and boxes to remain as they are currently installed. Exclude the following 1) Anything not mentioned above,shown on the scope of work or not reflected on drawings. All labor and material are guaranteed to be as specified in accordance with any drawings or specifications submitted or as agreed per this proposal for the sum of: $2,750.00 Any alteration or deviation from above specification involving extras,cost will be executed only upon written orders and will become an extra charge over the above estimate. This quote is good 30 days. 7hankyou forgiving us the opportunity to 6itlon this project foryou,if you have any question please give us a call. CjodBless You eruiz(@Igelectricalsei-vices.com Eric Ruiz: Acceptance of proposal by: Date: ACTP Commercial Change Date: 4/8/2022 COM Lobby Ceiling Devices To: Construction Masters Project: Baytown Animal Shelter P.O. Box 1587 Pearland,TX 77588 Attn: Adrian Guerra From: Sam Hartsfield 832-455-3706 ADT Commerical is pleased to provide this proposal for your consideration.This quotation shall remain firm for a period of forty-five(45)days from the proposal date,and price is based upon delivery of equipment within three(3)months. ADT Commercial payment terms are net 30 Scope of • Remove and Reinstall 2 ceiling devices Total Price: $ 450.00 Accepted By: Date: OMEm ' o o Koetter Fire Protection ,LLC Koetter Fire Protection 3005 Belll'ori Houston,TX 770i I Main Telephone 713-733-6889 Flre i,+nd:<r, scR.0 J73J FAX Telephone 713-733-6933 Fu A)+r . ACN.1.11 L'.tii4ui.lui FCR.1751119 April 08,2022 Flom General Contractor Michael Newell GC Contact 281-387-2191 GC Email Project Name Baytown Animal Services and Adoption Shelter �.x. 70N RODLR7 CI ANIFR D3-DAYTOWN,TX 17571 Ci0:01 Scope ofwork Drain system,rework 2 heads in lobby and retest system Total S650.00 Sincerely, Koetter Fire Protection of Houston,LLC of Houston,LLC By: N:eW Nt4w& Name: Michael Newell Date 4/8/2022 -ACCEPTANCE CLAUSE- By signature below,we hereby agree,accept,and authorize Koetter Fire Protection of Houston,tLC of Houston,LLC to proceed with the work described above under the terms and upon the conditions described herein. By NAmc Title: Company Name: Bata ONSTRUCTION ASTERS Of HOUSTON, INC. P.O. Box 1587 — Pearland, Texas 77588 — 281'997-2640 --Fax: 281 ;'485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 4/13/22 Change Proposal No: 18 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials and supervision for requested Millwork in Room 107 CWW $ 12,700.00 Subtotal $ 12,700.00 OH&P $ 635.00 Additional Bond Premium (2.5%up to$100K; 1.5% up to$500K) $ 200.03 Total Change Proposal Request $ 13,535.03 Additional Time Requested: Scope: 1. Add Approximately 28' of solid surface tops, support brackets, 3 drawer bases. 2. Add Approximately 20' Upper cabinets Reason: Owners Request Attachments: CWW, Drawing Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com 41 WvW MILLWORK 11353 Dover St,Houston,TX 77031 Phone: 832-619-1068 Fax: 281-530-1943 PROJECT: BAYTOWN ANIMAL SERVICES AND ADOPTION SHELTER LOCATION: CONTRACTOR: CONSTRUCTION MASTERS OF HOUSTON CONTACT: DENNIS BUSBY E-MAIL: dennis a cmhou.com PHONE: (713)254 69 28 SUBJECT: Change order room # 107 DATE: 04/12/2022 A. CWW CASEWORK: Agrees to fabricate and install the following per drawings and specs: 1. # 107 ROOM i. 3 base drawers, Solid surface counter tops, included brackets support where needed....................................................................$ 8,900.00 2. # 107 ROOM i. 20 In ft upper cabinets....................................................$3,800.00 Inclusions: Solid surface counter top, Hight pressure plastic laminate&Plywood. Exclusions: Glass, Electrical,plumbing, stainless steel, mechanical installations and any items not listed If any questions please feel free to contact us back at (832)619-1068 or email at reception i,c►vwmillworkllc.com Estimator:Jorge Buchely forge.b(a)cwwntill workllc.com Lo 43c.; 9' - 6" 9' - 5 /2" 5' - 5" Upper N 00 6 ' CN Solid 4 ' 5' - 5" I 00 SR. ACO OFFICE4 ACO OFFICE 23 106 107 *22 19 24 Base Cabinets AV- 4 � 4 ONSTRUCTION ASTERS Of HOUSTON, INC. P.O. Box 1587— Pearland, Texas 77588 —281 997-2640— Fax: 281 ;'485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 4/13/22 Change Proposal No: 19 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials and supervision for electrical add per RFI 27 response. LG $ 2,330.00 Subtotal $ 2,330.00 OH&P $ 116.50 Additional Bond Premium (2.5%up to$100K; 1.5%up to$500K) $ 36.70 Total Change Proposal Request $ 2,483.20 Additional Time Requested: Scope: Add Power to riser room for fire pump. Per RFI 27 Reason: Engineers Request Attachments: LG, RFI Response Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com ELECTRICAL SERVICES 132oq Ann Louise Rd. Houston,TX 77086 Phone(281)272 9130 Fax(832)230 0170 TECL#22275 HUB#1205233681000 CHANGE ORDER PROPOSAL Date: 04/10/2022 Proposal#LG5308-00 10 BAYTOWN ANIMAL HOSPITAL BAYTOWN, TX We hereby propose to furnish and install the following: 1. Add Circuit for dry sprinkler pump as requested. Labor and conduit, wire, breaker and snap switch to add a circuit from panel B to riser room. Exclude the following I) Anything not mentioned above,shown on the scope of work or not reflected on drawings. All labor and material are guaranteed to be as specified in accordance with any drawings or specifications submitted or as agreed per this proposal for the sum of:$29330.00 Any alteration or deviation from above specification involving extras,cost will be executed only upon written orders and will become an extra charge over the above estimate. This quote is good 30 days. 7fiankyou forgiving us Me opportunity to Won this project for you,if you Gave any question please give us a call: CjodBless Tou eruiz&I electricalservices.com Eric Ruiz: Acceptance of proposal by: Date: ADD NEW CIRCUIT TO PANEL "B" FOR COMPRESSOR. PROVIDE 15/1 CIRCUIT BREAKER. RUN #12 FEEDER. CUT SHEET NOT DOES STIPULATE WIRING METHOD SO PROVIDE A MOTOR RATED SNAP SWITCH OR RECEPTACLE FOR CORD AND PLUG CONNECTION AT COMPRESSOR AS REQUIRED. -RBR, BHB Complete Dry Sprinkler -- —� Z— System Filling Solutions AIR PRODUCTS Y g OL Oil-Less, Riser Mount Air Compressors Series for Low Pressure Dry Pipe & Pre-Action Sprinkler Systems General Air Products newly improved Low Pressure OL Plus Series Oil Less Riser Mount Fire Protection Air Compressors are UL 1450-VDUR Listed and specifically designed to fill eta g dry pipe and pre-action fire sprinkler systems to 20 PSI within 30 minutes per NFPA 13. UL UL 1450-VDUR Listed • ASME Pressure Safety Valve Oil-Less Piston Compressor • Bubble Tight Air Check Valve • UL Listed, Pre-Set Pressure Switch • Pre-Wired & Pre-Tested • Fully Automatic, Direct Drive • Lifetime Technical Support • Includes Riser Mounting Bracket, 30" Stainless Steel Flex Hose 8r Union ------- Amperage Recommended System M . . - . . . .- (amps) Wire Size (gage) Unit Capacity- — Weight FLA Up Run Run Run 115 4.0 28 12 12 12 320 OLR32016AC-LP 1.94 1/6 18 208-230 2.0 14 12 12 12 115 6.8 47.6 12 12 10 550 OLR55033AC-LP 3.33 1/3 21 208-230 3.4 23.8 12 12 12 6 860 OLR86050AC-LP 5.21 1/2 115 15 105 12 10 40 208-230 7.5 52.5 12 12 12 115 15 105 12 10 6 990 OLR99075AC-LP* 6.0 3/4 40 208-230 7.5 52.5 12 12 12 *System Capacity based on 30min fill at 20 PSIG and 70eF system temperature. ®WARNING:Cancer and Repmddctive Nafm- WULQaj= **CFM is based on the average free air delivery as the system fills from 0 to 20 PSIG. +Compressor has a capacity above 5.5 CFM at 10 PSIG.Air Maintenence Device required per NFPA 13. Fire Protection Air CompressorAccessories Air Maintenance Device - Part#AMD-1 Motor Line Starter- Thermal Overload Protection The AMD-1 regulates the volume of air . .- 2 being delivered to the sprinkler system by - t the air compressor. Y.HP 1 HP oo 7,m, Per NFPA 13-An Air Maintenance Device 1 HP 2 HP 0 is required on every dry system unless 2 HP 3 HP 1 the air compressor has a capacity less 3 HP 5 HP 1P than 5.5 ft'/min at 10 PSI. When Ordering a Motor Starter you must specify HP Voltage&Phase. generalairproducts.com 800-345-8207 Complete Dry Sprinkler ,_ *ro;A�MW A/RPRODUCTS System Filling Solutions OL Plus Series Low • • •n Air Compresso Model: OLR32016AC-LP 7.W RISER MOUNTING KIT(BRACKET, ASME RELIEF VALVE o o STRAPS.&ASSOCIATED HARDWARE) ®E i® O ®B® O .0 13.00 ° iii — FACE OF I/2' 1624 NPT OUTLET CHECK VALVE PRESSURE SWITCH J t FILTER Model: OLR55033AC-LP T 7.37-- ASME RELIEF VALVE RISER MOUNTING KIT(BRACKET O STRAPS,&ASSOCIATED HARDWARE( O 9.75 O MOD �— 6.75-- ° � FACE OFI/7' NPT OUTLET 17.77 0 0 HECK - PRESSURE SWITCH— O Models: OLR86050AG-LP OLR99075AC-LP ASME RE IEF VA V- RISER MOUNTING KIT(BRACKET STRAPS.&ASSOCIATED HARDWARE) aa00000000 0 u 10.92 6�B®®®®®�9 1a.m 72 �4.75--1 e 19I �HU71( FACE OF I/2' VA Vr NPT OUTLET :i.17 0 PRESSURE SWITCH 0 IR genera lairproducts.com 800-345-8207 ONSTRUCTION ASTERS OF HOUSTON, INC. P.O. Box 1587—Pearland, Texas 77588—281/997-2640—Fax: 281 /485-4702 Change Proposal Request Project: City of Baytown Animal Services and Adoption Shelter Date: 4/14/22 Change Proposal No: 20 To: Kim Dowdy Attn: Andrea Brinkley Construction Masters proposes to make the following changes to the original scope of work to provide labor, materials, and supervision for electrical adds for IT. Allowance T&M $85 an hour plus material. $ 5,000.00 Subtotal $ 5,000.00 OH&P $ 250.00 Additional Bond Premium (2.5% up to$100K; 1.5%up to$500K) $ 78.75 Total Change Proposal Request $ 5,328.75 Additional Time Requested: Scope: Miscellaneous conduits and boxes for IT. Reason: Owners Request Dennis Busby, Construction Masters of Houston, Inc www.cmhou.com